Rip rap calculator for Montana

Work out shoreline and slope tonnage from the required layer depth, since armor stone is placed much deeper than landscape material.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches
Add 5% extra for compaction & spillage

Plan on about 17 square feet from one ton of riprap. It sounds low, but it is right. Armor rock is placed in courses 12 inches thick or more, which gives it only a fraction of the coverage of landscape stone. This rip rap calculator uses installed depth and a density of 3,100 lb per cubic yard, based on material commonly sized 4 to 12 inches and above.

How to measure an armored bank

  1. Take your measurement along the bank face, not across the level ground. Multiply that sloped distance by the shoreline or channel length.
  2. Make the rock layer 1.5 to 2 times the biggest stone dimension. For erosion control, do not go below 12 inches.
  3. Find cubic yards by taking cubic feet / 27, then use x 1.55 to estimate tons.
Tons = (Slope-face area sq ft × Layer thickness in ÷ 12) ÷ 27 × 1.55

Tons and coverage

Layer thickness1 ton coversTons per 100 sq ft
12 inches≈ 17 sq ft5.7
18 inches≈ 12 sq ft8.6
24 inches≈ 9 sq ft11.5

Installation details for stable riprap

  • Put fabric or bedding beneath the rock: use non-woven geotextile, or 3-4 inches of #4 stone. Riprap laid straight on soil can hold its appearance for a season, then settle when the underlying bank starts washing away.
  • Bury the toe row below the waterline or anticipated scour depth. Bank protection often comes apart from the bottom first, so key that lower edge in.
  • Bring the bank to a 2:1 slope or flatter before placing rock. More stone does not solve a face that is too steep; that calls for engineering.
  • Use hand placement or a machine for the exposed upper course, fitting the stones together so they lock in place instead of stopping where they happen to roll.
  • For culvert outfalls, extend the apron 4-6 pipe diameters beyond the outlet. That downstream area takes the digging force.

Example calculation: 50 feet of pond bank

For 50 feet of shoreline with a 6-foot slope face, the area is 300 square feet. With an 18-inch course: 300 x 1.5 = 450 cubic feet = 16.7 cubic yards, which is about 26 tons of riprap, or 27 allowing a little extra. Include a geotextile roll, or plan on about 4 tons of #4 stone for a rock bedding layer. Check the truck path before you order. That final 20 feet near a pond can trap a loaded truck, and moving stone a second time costs twice.

Following the first major storm

After water recedes, take a pass along the bank. Check the toe for displaced rock, exposed soil between stones, visible fabric, and any scour at the outfall apron. Put shifted pieces back in place and use reserve stone to fill sparse areas. A couple of short checks each year, about Ten minutes apiece, helps keep the rock cover doing its job.

A quick guide to size classes

Size riprap for the water force at the site. Four to eight inch material works for pond banks, downspout outfalls, and slow streams. Use eight to twelve for lake edges receiving boat wake and for faster channels. Highway and spillway projects have their own engineered classes and depths, so use the drawing rather than this guide. If the choice is between sizes, go larger and increase the layer thickness; added stone weight gives more tolerance.

Riprap sizing, tonnage, and installation

How can I calculate the rip rap I need?
Calculate slope-face area times the layer depth in feet, then divide by 27 and multiply by 1.55. For a 10 x 10 test area at 12 inches, that comes to 37 cubic feet, or about 2.1 tons.
What coverage comes from 1 ton of riprap?
Expect about 17 square feet per ton at a 12-inch course and 12 at 18 inches. For a quick budget at the standard layer, figure 5.5 to 6 tons per 100 square feet.
What volume is 1 ton of rip rap?
A ton makes a pile of roughly two thirds of one cubic yard, about the volume of a washing machine, with 25-35 rocks in the 6-8 inch range. It can seem small until spread to the needed depth, where it covers a 4 x 4 section of bank.
What is the cost for 1 ton of rip rap?
RipRap is priced above construction stone and varies with the size class. See the current amount on our RipRap product page; delivery is free. Fabric and bedding stone add a fraction more, and getting those parts right costs less than correcting them later.
What depth should rip rap be installed at?
Set the course at one and a half to two times the largest stone dimension, never less than 12 inches. For typical 4-12 inch residential rock, use 12-18 inches. Larger material or fast water can require 24.
Is hand placement practical for rip rap?
For stone up to about 6-8 inch, hand placement can work with gloves and a strong back, though one ton still takes 25-35 lifts. Larger rock calls for equipment. A skid steer can place in an hour what a crew may take a day to hand-place.